Thursday, 1 March 2012

Construction Update- Sai Krushna Mandir


With the Divine Blessings and grace of our Beloved Swami, the children’s home – Sai Krushna Mandir – is to be inaugurated on 23rd November, 2012. As part of this, the SKM construction team is working to ensure that the architectural drawings, foundation and construction are all moving along expected timelines. In this March update we share with you the Front View that has been developed by the expert architects and reviewed by the SKM Construction Team.

As of now, architectural drawings and soil testing have been completed. Three point soil testing was done to identify the depth of foundation needed and estimate the cost and time for foundation. By Swami’s grace, the hard (solid) part of the ground was reached at a reasonable depth of approx 2 metres, hence the foundation need not be dug very deep.  In the month of March, structural design and the civil contract will be taken up. 